Train in operation Ascent rides: 08.00 – 16.30 / Descent rides: 08.00 – 17.00
Train in operation Ascent rides: 08.00 – 16.30 / Descent rides: 08.00 – 17.00

2012

New drive for the evacuation track

Each of the two tracks has a rescue tramway cabin with a capacity of 15 people. These cabins can be moved with an independent drive. The previously electrically operated drive unit was replaced by two independent hydraulic drives.

/