Train in operation Ascent rides: 08.30 – 16.30 / Descent rides: 08.30 – 17.00
Train in operation Ascent rides: 08.30 – 16.30 / Descent rides: 08.30 – 17.00

1960

Renewal of the Säntis cable car

The cable car was renovated and the fi rst of the three supports was not used anymore. The new cabins of the Säntis cable car had a capacity of 45. Since the new track ropes were more stable, the speed of the cable car could be increased.

/